|
#1
|
|||
|
|||
|
I ordered a Panamera Turbo, which has been sitting on the dock in the US now for about 12 days. The dealer tells me that the DOT has placed a hold on all Turbos and that the factory is currently working with them to resolve an issue, the details of which have never been explained to me. Is anyone else having this problem?? Does anyone know what the issue is or the expected timing of resolution??
|
| Sponsor - Register now for free to stop viewing this ad. |
|
#2
|
|||
|
|||
|
Surprised it is just the Turbos, a DOT hold would normally be safety spec related.
|
|
#3
|
|||
|
|||
|
They didn't hold mine. My turbo was delivered to the dealer on 10-20 and I took delivery on 10-23.
|
|
#4
|
|||
|
|||
|
Waiting stinks. Paid for mine just before Xmas. Its still sitting at the dealer, in storage waiting for salt to leave the roads here in sno-belt. It's killin me. Haven't even driven a Panamera yet. I get to visit though.
__________________
'10 Panamera Turbo 73.5T '89 C4 |
![]() |
«
Previous Thread
|
Next Thread
»
| Thread Tools | |
| Display Modes | |
|
|
All times are GMT. The time now is 10:37 PM.




Linear Mode
